Short answer: At VSME, production takes 35–45 days from final drawing approval, in our own factory of over 10,000 m² in Gaoming District, Foshan. The clock starts when the final drawings, finishes and hardware are approved, not when you first send an enquiry. Sea freight, customs clearance and local delivery come after production and are quoted for your port.
Buyers usually ask "how long" before anything else, and the honest answer has two parts: the time it takes to agree the design, and the time the factory needs to build it. The second part is fixed; the first part depends on how quickly drawings are confirmed. This page explains both, using VSME's own order process.
| Stage | What happens | Time |
|---|---|---|
| 1. Send your room sizes | Floor plan or wall dimensions, ceiling height, door and window positions | Depends on you |
| 2. Layout and 3D renderings | Our designers prepare the layout and renderings for you to confirm | Depends on revisions |
| 3. Confirm the order | Specification and quotation; payment through Alibaba.com Trade Assurance | Final drawing approval |
| 4. Production in our own factory | Production in our own factory, with 3-step QC | 35–45 days |
| 5. Packing and shipping | Export packing; freight quoted for your destination | Sea freight by route |
VSME has more than 20 professionally trained designers, so the design stage is handled in-house. The fastest orders are the ones where the buyer sends complete measurements at the start and approves the drawings in one or two rounds.
For Australia and New Zealand, the total time from final drawing approval to delivery is about 56–80 days for Australia and about 80–105 days for New Zealand. Both include the 35–45 days of production; the rest is sea freight, customs clearance and local delivery. For other countries, we estimate the route when we quote. See our import checklists for Australia, the United States, the United Kingdom and Canada.
Production takes 35–45 days from final drawing approval, in VSME’s own factory in Gaoming District, Foshan, China.
It starts when the final drawings, finishes and hardware are approved. Time spent on measurements, layout revisions and quotation comes before that.
Samples take 7–14 days to prepare. Sample freight is paid by the buyer.
About 56–80 days from final drawing approval to Australia and about 80–105 days to New Zealand, including production, sea freight, customs clearance and local delivery.
Yes. VSME makes kitchens, wardrobes and walk-in closets, bathroom vanities, interior doors and wall panels, so one order can cover the whole house. The schedule for a large order is confirmed with the quotation.
Written by the VSME Design & Export Team. VSME is a brand of Foshan Moyisi Home Furnishings Co., Ltd. Facts on this page match our company facts page.