News

Importing Custom Cabinets from China to Thailand: ACFTA Form E, Duty and VAT Checklist

2026-11-26 0 Leave me a message

Short answer: Yes. VSME, a brand of Foshan Moyisi Home Furnishings Co., Ltd., builds custom kitchens, wardrobes and vanities in its own factory of over 10,000 m² in Gaoming District, Foshan, and ships them from Nansha, Guangzhou to Thai ports such as Laem Chabang and Bangkok. Production takes 35–45 days from final drawing approval; sea freight, customs clearance and local delivery are estimated for your port when we quote. Before you pay a deposit, ask for a Form E certificate of origin, which is needed to claim the ASEAN–China Free Trade Area (ACFTA) preferential rate, and plan for Thailand's 7% VAT on top of duty.

This page walks through the import in order and shows who usually handles each step. It is written for homeowners, builders, architects and interior designers who are comparing a factory-direct order with buying locally. Duty and tax are calculated per tariff code, so the numbers that matter most come from your customs broker for your exact goods, not from a general article.

VSME cabinet showroom in Lecong, Foshan, China

3 checks before the deposit: importer, Form E, landed cost

  • Who is the importer. The importer files the import declaration with Thai Customs, usually through a licensed customs broker. If you are buying through a Thai company or contractor, agree who imports the goods.
  • Form E for ACFTA. The preferential ACFTA rate depends on the correct tariff code and a valid Certificate of Origin Form E issued in China. Tell us at quotation stage that you need it, so it is issued with the export documents and matches the invoice.
  • Landed cost. Ask your broker for the duty and taxes on each tariff code, plus port, clearance and delivery charges, and add them to the factory price before comparing with a local cabinet maker. One house can contain several tariff codes: kitchen cabinets, wardrobes, vanities, doors, wall panels, worktops and lighting.

Import sequence: 35–45 days of production, then freight, clearance and delivery

Step What happens Who usually does it When
1. Freeze the order Drawings, cabinet list, board and finish, hardware, worktop decision You and the factory Before deposit
2. Agree the delivery term Incoterm and named port (e.g. FOB Nansha), who books freight and insurance You and the factory In the contract
3. Production Cutting, finishing, assembly, trial fit Factory 35–45 days from final drawing approval at VSME
4. Pre-shipment inspection Goods checked against the drawings before the balance is paid You, your agent or an inspection company End of production
5. Export documents Commercial invoice, packing list, bill of lading, origin document if needed, Form E certificate of origin Factory, with your forwarder Before loading
6. Freight Shared (LCL) or full container from Nansha to Laem Chabang or Bangkok Your forwarder (FOB) or the factory (CIF) Ask your forwarder for the current schedule
7. Customs clearance Import declaration filed with Thai Customs, duty and VAT paid, goods examined if selected Your licensed customs broker On arrival
8. Delivery and installation Delivery from the port, unpacking, installation by local trades or by VSME on request Your installer and transport company After release

Customs duty, ACFTA and 7% VAT

Customs duty. Duty is set per tariff code. With a valid Form E, goods of Chinese origin can be cleared at the ACFTA preferential rate instead of the general rate; your broker confirms the rate for each code.

VAT. Thailand's general VAT rate is currently 7%, and VAT on imports is paid at customs on the import value plus duty and other taxes. See the Revenue Department page on VAT.

Other costs. Allow for broker fees, port and terminal charges, inspection fees if the container is selected, and delivery from the port. On small shipments these can be larger than the duty itself, so ask for an itemised landed-cost estimate. Our cost guide by specification explains what moves the factory price.

Packaging and documents

  • Solid-wood packaging. Wooden pallets and crates should be treated and marked to ISPM 15, the international standard for wood packaging.
  • Matching documents. The commercial invoice, packing list and bill of lading must describe the same goods, quantities and parties as the import declaration.
  • Packing by room. We pack and label modules and fittings by room, so the installer can find each cabinet without opening every carton.
  • Lighting and appliances. If your order includes LED lighting or appliances, confirm the voltage and plug type for your country before production.

How long delivery to Thailand takes

Production takes 35–45 days from final drawing approval in our own factory. Sea freight, customs clearance and local delivery come on top, and we estimate them for your port when we quote, because they depend on the route, the port and the season. See how long custom cabinets take for how the production clock is counted.

Our side: drawings, trial assembly, export documents, loading at Nansha

For orders to Thailand, VSME (Foshan Moyisi Home Furnishings Co., Ltd.) prepares shop drawings and 3D renderings for your approval, builds and trial-assembles the cabinets in our own factory of over 10,000 m² in Gaoming District, Foshan, packs the modules and fittings by room, prepares the export documents and loads at Nansha, Guangzhou. You are welcome to send an inspector before the balance payment, or to visit our two-floor showroom of over 1,000 m² in Lecong, Foshan. Payment is made through Alibaba.com Trade Assurance. Orders start at USD 5,000. On-site installation is available worldwide on request, with fees quoted per project. Online video support for installation is also provided. Our quote checklist lists what to send, and our factory verification checklist explains what to check about any supplier before a deposit.

Importing cabinets to Thailand? Send your floor plan, room sizes and delivery city to moyisi@vsmehome.com or use our contact page. We quote FOB or CIF and list what each price includes, so your broker can work out the landed cost.

Frequently asked questions

Can I import custom kitchen cabinets from China to Thailand?

Yes. VSME builds custom kitchens, wardrobes and vanities in its own factory in Gaoming District, Foshan, and ships them to Thailand. Production takes 35–45 days from final drawing approval; freight, clearance and delivery are estimated for your port.

Can cabinets from China enter Thailand at a lower duty?

Goods of Chinese origin can claim the ASEAN–China Free Trade Area preferential rate with a valid Certificate of Origin Form E. Ask your broker for the rate on each tariff code.

How much VAT is charged on imported cabinets in Thailand?

The general VAT rate is currently 7%, paid at customs on the import value plus duty and other taxes.

Can I see the finishes before ordering?

Yes. You can visit our two-floor showroom of over 1,000 m² in Lecong, Foshan, or ask for finish samples, which take 7–14 days to prepare. Sample freight is paid by the buyer.

How long does delivery from China to Thailand take?

Production takes 35–45 days from final drawing approval. Sea freight, customs clearance and local delivery come on top and are estimated for your port when we quote. VSME orders start at USD 5,000, and one home's cabinets can ship in a shared (LCL) container.

Official sources checked

Rules checked against official sources in November 2026. Tariffs and import rules change; confirm them for your shipment with a licensed customs broker before ordering. This page is a practical checklist, not legal or customs advice.

Written by the VSME Design & Export Team. VSME is a brand of Foshan Moyisi Home Furnishings Co., Ltd. Company facts on this page match our buyer facts page. Other import checklists: United States, Australia, United Kingdom, Canada.

Related News
Leave me a message
X
We use cookies to offer you a better browsing experience, analyze site traffic and personalize content. By using this site, you agree to our use of cookies. Privacy Policy
RejectAccept