Short answer: Yes. VSME, a brand of Foshan Moyisi Home Furnishings Co., Ltd., builds custom kitchens, wardrobes and vanities in its own factory of over 10,000 m² in Gaoming District, Foshan, and ships them to New Zealand. Delivery takes about 80–105 days from final drawing approval, including 35–45 days of production, sea freight, customs clearance and local delivery. Goods of Chinese origin can claim preferential duty under the New Zealand–China Free Trade Agreement, 15% GST is charged at the border, and the importer must meet MPI biosecurity rules for wood packaging and New Zealand's ban on asbestos-containing products.
This page walks through the import in order and shows who usually handles each step. It is written for homeowners, builders, architects and interior designers who are comparing a factory-direct order with buying locally. Duty and tax are calculated per tariff code, so the numbers that matter most come from your customs broker for your exact goods, not from a general article.
| Step | What happens | Who usually does it | When |
|---|---|---|---|
| 1. Freeze the order | Drawings, cabinet list, board and finish, hardware, worktop decision | You and the factory | Before deposit |
| 2. Agree the delivery term | Incoterm and named port (e.g. FOB Nansha), who books freight and insurance | You and the factory | In the contract |
| 3. Production | Cutting, finishing, assembly, trial fit | Factory | 35–45 days from final drawing approval at VSME |
| 4. Pre-shipment inspection | Goods checked against the drawings before the balance is paid | You, your agent or an inspection company | End of production |
| 5. Export documents | Commercial invoice, packing list, bill of lading, origin document if needed, origin evidence, New Zealand Sea Container Declaration if wood packaging is used | Factory, with your forwarder | Before loading |
| 6. Freight | Shared (LCL) or full container from Nansha to a New Zealand port such as Auckland | Your forwarder (FOB) or the factory (CIF) | Ask your forwarder for the current schedule |
| 7. Customs clearance | Import entry lodged with NZ Customs, duty and GST paid, MPI biosecurity clearance | Your licensed customs broker | On arrival |
| 8. Delivery and installation | Delivery from the port, unpacking, installation by local trades or by VSME on request | Your installer and transport company | After release |
Customs duty. Duty depends on the tariff classification of each item; with valid origin evidence, goods of Chinese origin can be cleared at the NZ–China FTA preferential rate. Your broker confirms the rate for each line.
GST. GST is charged at 15% on the value of the goods plus duty, freight and insurance. Consignments worth more than NZD 1,000 pay duty and GST at the border. See NZ Customs on duty and GST.
Other costs. Allow for broker fees, port and terminal charges, inspection fees if the container is selected, and delivery from the port. On small shipments these can be larger than the duty itself, so ask for an itemised landed-cost estimate. Our cost guide by specification explains what moves the factory price.
Total delivery time to New Zealand is about 80–105 days from final drawing approval. This includes 35–45 days of production in our own factory, sea freight, customs and biosecurity clearance and local delivery. For comparison, Australia is about 56–80 days from final drawing approval; see our Australia import checklist. Book your installer for a date after the estimated delivery, and see how long custom cabinets take for how the production clock is counted.
For New Zealand orders, VSME (Foshan Moyisi Home Furnishings Co., Ltd.) prepares shop drawings and 3D renderings for your approval, builds and trial-assembles the cabinets in our own factory of over 10,000 m² in Gaoming District, Foshan, packs the modules and fittings by room, prepares the export documents and loads at Nansha, Guangzhou. You are welcome to send an inspector before the balance payment, or to visit our two-floor showroom of over 1,000 m² in Lecong, Foshan. Payment is made through Alibaba.com Trade Assurance. Orders start at USD 5,000. On-site installation is available worldwide on request, with fees quoted per project. Online video support for installation is also provided. Our quote checklist lists what to send, and our factory verification checklist explains what to check about any supplier before a deposit.
Importing cabinets to New Zealand? Send your floor plan, room sizes and delivery city to moyisi@vsmehome.com or use our contact page. We quote FOB or CIF and list what each price includes, so your broker can work out the landed cost.
Yes. VSME builds custom kitchens, wardrobes and vanities in its own factory in Gaoming District, Foshan, and ships them to New Zealand. Delivery takes about 80–105 days from final drawing approval.
About 80–105 days from final drawing approval, including 35–45 days of production, sea freight, customs and biosecurity clearance and local delivery.
Duty depends on the tariff classification. Goods of Chinese origin can claim the NZ–China FTA preferential rate with valid origin evidence. GST of 15% applies to the value plus duty, freight and insurance.
Wood packaging must carry an ISPM 15 mark or come with treatment certificates, and packers of sea containers with wood packaging complete the New Zealand Sea Container Declaration. Asbestos-containing products are prohibited without an EPA permit.
No. VSME orders start at USD 5,000, and one home's cabinets can ship in a shared (LCL) container or a 20 ft container.
Rules checked against official sources in November 2026. Tariffs and import rules change; confirm them for your shipment with a licensed customs broker before ordering. This page is a practical checklist, not legal or customs advice.
Written by the VSME Design & Export Team. VSME is a brand of Foshan Moyisi Home Furnishings Co., Ltd. Company facts on this page match our buyer facts page. Other import checklists: United States, Australia, United Kingdom, Canada.